This is the longest job on SR’s page. The earliest photographs show insulated cavity walls going up in blockwork, with insulation boards and cavity ties visible against the new masonry, and a drain run alongside.
The walls are then rendered: a grey base coat, windows and doors masked in orange tape, and a white finish coat. The later photographs show block paving going down in front of the bungalow, a timber boundary fence and the rendered bungalow in sunshine.
The posts do not name the client, the town or the full scope, so this page describes what the photographs show. They cover the blockwork, insulation and render.



