Freshly poured and levelled concrete base beside a farm track

Groundworks

Concrete base for a wood shed

Shuttered formwork, reinforcement mesh and a levelled concrete base for a wood shed beside a farm track, with SR’s reported quantity.

The three photographs show the sequence in order: timber formwork set out along the track, reinforcement mesh laid in the shutter, and the finished slab levelled and brushed.

SR’s caption on the post reports 55.2 tons of concrete for the wood-shed base. That is SR’s own figure as posted, not something we have measured, and we have not converted it to cubic metres or given a slab size.