Two different finishes appear in this set. The bungalow has a fine textured grey render under a white fascia, with white windows and a clean line at the plinth.
The retaining wall below a scaffolded building has a smooth, floated finish with a block coping, photographed while the plasterer is still working along it. The compressor and bagged material in the background show how the job was fed.
The posts do not say which mixes or beads were used, so the specification is not stated here.



