SR posted this one as a finished job in Truro. The photographs run from the opened-up hallway, with studwork around the boiler cupboard and a timber-framed doorway waiting for its plaster, to the finished rooms.
The finished bedroom has panelled lower walls, built-in wardrobes and a woven pendant. The hallway has crisp reveals around a glazed fanlight, and the shower room has dark green wall tiles above a patterned floor.
The photos do not say what the full schedule of work was or who carried out the carpentry and tiling, so this page describes what is visible: the walls and ceilings are plastered and ready for decoration or decorated.



